01 Remind workers to communicate in time when finding problems
This one is very important, not only for tiling, I think it can involve all aspects of decoration, most afraid that workers will make decisions without authorization. I think a qualified construction party should take no pains to communicate with the landlord for confirmation.
Make an agreement with the workers, do not wait until the laying is completed to feed back the problems, which causes the construction party and the material party to shift responsibilities. It is suggested that the workers should be informed clearly before construction, and the quality problems of ceramic tiles should be notified in time, so that the material party and the construction party can be invited to identify and solve the problems together in time.
For example, last year, my family had a few pieces of bricks that were bumped during transportation. I asked my master to find out and confirm with me before laying them. He pasted one piece first. Fortunately, the project manager saw it and confirmed it with me. Sometimes the master was kind enough to save money for the landlord. He thought it would not be obvious to make up for a little missing corner, but the landlord might want effect rather than saving money.
02 Make brick arrangement plan before paving
Some workers pave the bricks as soon as they get them. Only when the bricks are paved to a certain extent can they find that the proportion is not harmonious and the overall aesthetic level is poor. Suggestion: before paving, make a brick laying plan.
Although now the tile merchants with good service will measure carefully, design, lay, process well, and give the laying drawings, but there is another thing that they will not pay attention to, that is, tile texture layout.
My family has been cut and processed. The texture is sparse and dense. It will look good if it is arranged properly. I'm in a hole at this point.
03 Do you want to soak
Wall tiles and tiles need to be soaked in water. No need to soak on the wall of porcelain tiles. Ask the brick seller specifically. If it is the ceramic tile to be soaked, it should be combined with the construction progress of the workers, and the number of bubbles needed should not be soaked all at once. The ceramic tiles soaked in water will affect the secondary sales. Generally, the manufacturers cannot return or replace them, which will cause unnecessary waste.
Although the wall on the floor tile does not need to be soaked in water, the construction process is more complicated. Generally, it needs to brush the back glue. If the specification and size are large, it needs to hang the stainless steel sheet and use the tile glue to pave. If it is paved with ordinary cement mortar, it is likely to cause hollowing or falling off.
04 caulking and caulking
Ceramic tiles generally need to be seamed, even if it is porcelain tiles on the wall, there will be 2mm joints. If the seam is too small, the ceramic tile is easy to crack the glaze or surface after thermal expansion and contraction. What kind of bricks do you want to buy? You can consult the material supplier before buying current affairs.
Filling and beautifying the joints are generally carried out after the tiles have been laid for at least 24 hours. The physical properties of beautifying the joints are better than those of traditional joint fillers. Of course, the construction cost is much higher, and some people do it by themselves, but it requires more physical strength than experience, which is not easy,