I. Preface
When we receive a new moldto be proofed and tested, we are always eager to get a result earlier and pray for a smooth process to avoid wasting time and causing trouble.
But here we must remind two points: First, mold designer and manufacturing technicians sometimes make mistakes. If we don't be vigilant when we try the mold, we may cause great damage due to small mistakes. Second, the result of die test is to ensure the smooth production in the future. If reasonable steps are not followed and proper records are made in the process of mold testing, the smooth progress of mass production cannot be guaranteed. We emphasize that "if the mold is used smoothly, the profit recovery will be increased rapidly, otherwise the cost loss will be even greater than the cost of the mold itself".
Second, the matters needing attention before test
1. Understand the relevant materials of the mold:
It is best to obtain the design drawing of the mold, analyze it in detail, and get the mold technician to participate in the mold test.
2. First check the mechanical coordination action on the workbench:
Pay attention to whether there are scratches, missing parts, looseness, etc., whether the die moves towards the skateboard accurately, whether there is any leakage at the water channel and air pipe joint, and if the opening distance of the die is limited, it should also be marked on the die. If the above actions can be done before hanging the mold, it can avoid the waste of man-hours when the mold is hung and then disassembled.
3. When it is determined that each part of the mold moves properly, it is necessary to select a suitable test injection machine, which should be paid attention to when selecting
(a) ejection capacity
(b) Width of guide bar
(c) Maximum driving distance
(d) Spare parts
Whether it is complete, etc. After everything is confirmed to be ok, the next step is to hang the mold. When hanging, pay attention to not take off the hook before locking all the clamping plates and opening the mold, so as to avoid the clamping plates being loose or broken and the mold falling.
After the mold is installed, carefully check whether the mechanical actions of each part of the mold, such as sliding plate, ejector pin, tooth withdrawal structure and limit switch, are correct. And pay attention to whether the injection nozzle is aligned with the feed inlet. The next step is to pay attention to the mold closing action. At this time, the mold closing pressure should be lowered. During manual and low-speed mold closing actions, pay attention to see if there are any unsmooth actions and abnormal sounds.
4. Raise the mold temperature:
According to the properties of raw materials used in the finished product and the size of the mold, select an appropriate mold temperature control machine to raise the temperature of the mold to the required temperature during production.
After the mold temperature is raised, it is necessary to review the actions of each part again, because the steel may cause mold clamping after thermal expansion, so it is necessary to pay attention to the sliding of each part to avoid strain and vibration.
5. If the experimental planning rule is not implemented in the factory, we suggest that only one condition can be adjusted at a time when adjusting the test conditions, so as to distinguish the influence of single condition change on the finished product.
6. According to different raw materials, bake the original pots appropriately.
7. Try to use the same raw materials as possible for mold testing and mass production in the future.
8. Don't completely sample the mold. If there is any color demand, you can arrange the color test together.
9. Problems such as internal stress often affect the secondary processing, so the secondary processing should be done after the die test and the finished product is stable. After the die is closed slowly, the closing pressure should be adjusted and acted several times to check whether there is any uneven clamping pressure, so as to avoid burrs and deformation of the finished product.
After all the above steps are checked, lower the mold closing speed and pressure, fix the safety buckle rod and ejection stroke, and then adjust the normal mold closing speed and mold closing speed. If the limit switch of maximum stroke is involved, the mold opening stroke should be adjusted slightly shorter, and the high-speed mold opening action should be cut off before the maximum stroke of mold opening. This is because in the whole mold opening stroke during mold loading, the high-speed operation stroke is longer than the low-speed one. On the plastic machine, the mechanical ejector rod must be adjusted to act after the full-speed mold opening action, so as to avoid the deformation of the ejector plate or stripping plate due to stress.
Please check the following items again before making the first shot:
(a) Whether the feeding stroke is too long or insufficient.
(b) Whether the pressure is too high or too low.
(c) Whether the mold filling speed is too fast or too slow.
(d) Whether the processing cycle is too long or too short.
To prevent short shot, fracture, deformation, burrs and even damage to the mold.
If the processing cycle is too short, the ejector pin will push through the finished product or peel off the ring and crush the finished product. This kind of situation may make it take you two or three hours to take out the finished product.
If the processing cycle is too long, the weak part of the die core may be broken due to the tightening of the rubber compound.
Of course, you can't predict all the problems that may occur in the process of mold testing, but taking full consideration and timely measures in advance will help you avoid serious and expensive losses.
Third, the main steps of mold testing
In order to avoid unnecessary waste of time and troubles in mass production, it is really necessary to pay patience to adjust and control various processing conditions, find out the best temperature and pressure conditions, and formulate standard mold testing procedures, which can be used to establish daily working methods.
1. Check whether the plastic material in the charging barrel is correct and whether it is baked according to the regulations (different results may be obtained if different raw materials are used for mold testing and production).
※ 2. the material pipe shall be cleaned thoroughly to prevent degraded rubber or miscellaneous materials from being injected into the mold, because degraded rubber and miscellaneous materials may jam the mold. Test whether the temperature of the material pipe and the temperature of the mold are suitable for the raw materials to be processed.
3. Adjust the pressure and injection quantity in order to produce a finished product with satisfactory appearance, but do not run burrs, especially when some die cavity finished products have not been completely solidified, consider before adjusting various control conditions, because a slight change in mold filling rate may cause a great change in mold filling.
4. Wait patiently until the conditions of the machine and die are stable, even for medium-sized machines, it may take more than 30 minutes. This time can be used to check the possible problems of finished products.
5. The advance time of the screw should not be shorter than the solidification time of the gate plastic, otherwise the weight of the finished product will be reduced and the performance of the finished product will be damaged. And when the mold is heated, the advancing time of the screw should be lengthened to compact the finished product.
6. Reasonably adjust and reduce the total processing cycle.
7. Run the newly transferred condition for at least 30 minutes to be stable, and then continuously produce at least a dozen full-pattern products, mark the date and quantity on their containers, and place them separately according to die holes, so as to test the stability of their actual operation and derive reasonable control tolerance. (especially valuable for multi-cavity dies).
8. Measure and record the important dimensions of continuous samples (measure them when the samples are cooled to room temperature).
9. Compare the measured dimensions of each sample, and pay attention to:
(a) Whether the dimensions are stable.
(b) Whether there is a trend of increasing or decreasing certain dimensions, which indicates that the machining conditions are still changing, such as poor temperature control or oil pressure control.
(c) whether the size change is within the tolerance range.
10. If the size of the finished product is not changed and the processing conditions are normal, it is necessary to observe whether the quality of the finished product in each die cavity is acceptable and its size is within the allowable tolerance. Write down the measured die cavity numbers which are larger or smaller than the average value continuously, so as to check whether the dimensions of the die are correct. Record and analyze the data as a need to modify the mold and production conditions, and as a reference for future mass production.
Four, the problems should be paid attention to when testing:
1. Make the processing run longer to stabilize the temperature of molten glue and hydraulic oil.
2. Adjust the machine conditions according to the size of all finished products that are too large or too small. If the shrinkage rate is too large and the finished products appear to be insufficient, it can also be used for reference to increase the gate size.
3. If the dimensions of each die cavity are too large or too small, correct them. If the dimensions of die cavity and gate are correct, then try to change the machine conditions, such as mold filling rate, mold temperature and pressure of each part, and check whether some die cavities are filled slowly.
4. according to the matching situation of the finished products of each die cavity or the shift of the die core, make individual corrections, and perhaps adjust the filling rate and die temperature again to improve its uniformity
5. Checking and correcting the faults of the injection machine, such as the defects of oil pump, oil valve and temperature controller, will cause the change of processing conditions, and even the perfect mold can not exert good working efficiency in the poorly maintained machine.
After reviewing all the recorded values, keep a set of samples for proofreading and comparing whether the corrected samples are improved.
V. Important Matters
Keep all records of sample inspection in the process of mold test properly, including various pressures in the processing cycle, melting glue and mold temperature, material tube temperature, injection action time, screw feeding time, etc. In short, keep all data that will help to successfully establish the same processing conditions in the future, so as to obtain products meeting quality standards.
At present, the mold temperature is often ignored in the factory mold test, but it is the most difficult to master in the short-term mold test and mass production in the future, and the incorrect mold temperature is enough to affect the sample size, luminosity, shrinkage, striation, material shortage and other phenomena, which may cause difficulties if the mold temperature controller is not used to handle the mass production in the future.